Multi-stage goal programming models for production optimization in the middle and later periods of oilfield development
From MaRDI portal
(Redirected from Publication:1699097)
Recommendations
- Multiperiod optimization model for oilfield production planning: bicriterion optimization and two-stage stochastic programming model
- The study to the optimal model of programming the measurement to increasing the production in oil field in relationally
- Optimization methods for petroleum fields development and production systems: a review
- A computational analysis of multidimensional piecewise-linear models with applications to oil production optimization
- Multi-objective optimization model for a downstream oil and gas supply chain
Cites work
- A computational analysis of multidimensional piecewise-linear models with applications to oil production optimization
- A goal programming approach for farm planning with resources dimensionality
- Deriving weights from pairwise comparison matrices
- Financial portfolio management through the goal programming model: current state-of-the-art
- Modeling Norwegian petroleum production and transportation
- Oil production optimization solved by piecewise linearization in a branch \& price framework
- Optimal estimation of executive compensation by linear programming
- Using the analytic hierarchy process and multi-objective programming for the selection of cost drivers in activity-based costing
Cited in
(9)- Industrial petrochemical production planning and expansion: A multi-objective linear programming approach
- The study to the optimal model of programming the measurement to increasing the production in oil field in relationally
- Optimization methods for petroleum fields development and production systems: a review
- Multiperiod optimization model for oilfield production planning: bicriterion optimization and two-stage stochastic programming model
- Multi-period optimization for long-term oilfield production planning
- A computational analysis of multidimensional piecewise-linear models with applications to oil production optimization
- Multi-objective optimization of crude oil-supply portfolio based on interval prediction data
- Drainage area maximization in unconventional hydrocarbon fields with integer linear programming techniques
- Optimisation of an existing water injection network in an oilfield for multi-period development
This page was built for publication: Multi-stage goal programming models for production optimization in the middle and later periods of oilfield development
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1699097)