Minimizing total completion time of batch scheduling with nonidentical job sizes
From MaRDI portal
Publication:1699779
DOI10.1007/978-3-319-71150-8_16zbMATH Open1470.90028OpenAlexW2768731780MaRDI QIDQ1699779FDOQ1699779
Authors: Rongqi Li, Zhiyi Tan, Qianyu Zhu
Publication date: 26 February 2018
Full work available at URL: https://doi.org/10.1007/978-3-319-71150-8_16
Recommendations
- Batch scheduling of nonidentical job sizes with minsum criteria
- Minimizing makespan and total completion time for parallel batch processing machines with non-identical job sizes
- Parallel-machine batch scheduling with non-identical job sizes
- Improved bounds for batch scheduling with nonidentical job sizes
- Minimizing makespan on a single batch processing machine with nonidentical job sizes
Deterministic scheduling theory in operations research (90B35) Abstract computational complexity for mathematical programming problems (90C60)
Cited In (5)
- Improved bounds for batch scheduling with nonidentical job sizes
- Minimizing makespan and total completion time for parallel batch processing machines with non-identical job sizes
- Batch scheduling of nonidentical job sizes with minsum criteria
- Title not available (Why is that?)
- Batch scheduling with deteriorating jobs to minimize the total completion time
This page was built for publication: Minimizing total completion time of batch scheduling with nonidentical job sizes
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1699779)