Variable neighbourhood search and mathematical programming for just-in-time job-shop scheduling problem
From MaRDI portal
Publication:1718383
DOI10.1155/2014/431325zbMath1407.90179OpenAlexW2139755548WikidataQ59067154 ScholiaQ59067154MaRDI QIDQ1718383
Publication date: 8 February 2019
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2014/431325
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (2)
A meta-heuristic to solve the just-in-time job-shop scheduling problem ⋮ Heuristic and exact algorithms for the two-machine just in time job shop scheduling problem
Cites Work
- Improving simulated annealing with variable neighborhood search to solve the resource-constrained scheduling problem
- Variable neighborhood search for parallel machines scheduling problem with step deteriorating jobs
- Lagrangian bounds for just-in-time job-shop scheduling
- Dynamic job shop scheduling using variable neighbourhood search
- Sequencing with Earliness and Tardiness Penalties: A Review
- Variable neighborhood search: Principles and applications
This page was built for publication: Variable neighbourhood search and mathematical programming for just-in-time job-shop scheduling problem