The sales force sizing problem with multi-period workload assignments, and service time windows
From MaRDI portal
Publication:1725834
DOI10.1007/s10100-017-0501-zOpenAlexW2766457182MaRDI QIDQ1725834
Publication date: 15 February 2019
Published in: CEJOR. Central European Journal of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10100-017-0501-z
Uses Software
Cites Work
- Rich vehicle routing problems: from a taxonomy to a definition
- Pattern-based decompositions for human resource planning in home health care services
- Improved load balancing and resource utilization for the skill vehicle routing problem
- Heuristics for the multi-period orienteering problem with multiple time windows
- A comparison of techniques for solving the fleet size and mix vehicle routing problem
- A general vehicle routing problem
- Scatter search for the fleet size and mix vehicle routing problem with time windows
- Industrial aspects and literature survey: fleet composition and routing
- The fleet size and mix vehicle routing problem
- Resource constrained routing and scheduling: review and research prospects
- Exact and hybrid methods for the multiperiod field service routing problem
- Personnel scheduling: a literature review
- A unified solution framework for multi-attribute vehicle routing problems
- The Truck Dispatching Problem
- The Skill Vehicle Routing Problem
- The fleet size and mix vehicle routing problem with time windows
- Routing a Heterogeneous Fleet of Vehicles
- The Period Vehicle Routing Problem and its Extensions
- New heuristics for the Fleet Size and Mix Vehicle Routing Problem with Time Windows
- Industrial Vehicle Routing
- Vehicle Routing Problem with Time Windows
- A Computational Study Of A New Heuristic For The Site-Dependent Vehicle Routing Problem
- A Tabu Search Algorithm For The Site Dependent Vehicle Routing Problem With Time Windows
- Pricing strategies for the site-dependent vehicle routing problem
This page was built for publication: The sales force sizing problem with multi-period workload assignments, and service time windows