A hybrid metaheuristic approach for minimizing the total flow time in a flow shop sequence dependent group scheduling problem

From MaRDI portal
Publication:1736622

DOI10.3390/a7030376zbMath1461.90042OpenAlexW2123087625MaRDI QIDQ1736622

Xianqiang Yang

Publication date: 26 March 2019

Published in: Algorithms (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.3390/a7030376




Related Items (3)


Uses Software


Cites Work


This page was built for publication: A hybrid metaheuristic approach for minimizing the total flow time in a flow shop sequence dependent group scheduling problem