An improved shuffled frog-leaping algorithm for flexible job shop scheduling problem
From MaRDI portal
Publication:1736634
Recommendations
- An effective shuffled frog-leaping algorithm for multi-objective flexible job shop scheduling problems
- Optimization of job shop scheduling based on a shuffled frog leaping algorithm
- A novel shuffled frog leaping algorithm for low carbon flexible job shop scheduling
- A shuffled frog-leaping algorithm for multi-objective no-wait flowshop scheduling
- Flexible job shop scheduling problem based on improved genetic algorithm
- An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem
- Solving a bi-criteria permutation flow-shop problem using shuffled frog-leaping algorithm
- An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem
Cites work
- A genetic algorithm for the flexible job-shop scheduling problem
- A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems
- A novel elitist multiobjective optimization algorithm: Multiobjective extremal optimization
- A support vector machine with the tabu search algorithm for freeway incident detection
- An improved ant colony optimization for vehicle routing problem
- Effective neighbourhood functions for the flexible job shop problem
- Routing and scheduling in a flexible job shop by tabu search
- The Complexity of Flowshop and Jobshop Scheduling
Cited in
(9)- A novel shuffled frog leaping algorithm for low carbon flexible job shop scheduling
- Optimization of job shop scheduling based on a shuffled frog leaping algorithm
- scientific article; zbMATH DE number 5952642 (Why is no real title available?)
- An effective shuffled frog-leaping algorithm for multi-objective flexible job shop scheduling problems
- An improved shuffled frog leaping algorithm for the autonomous selection of evolutionary strategies
- An intercell scheduling approach using shuffled frog leaping algorithm and genetic programming
- A shuffled frog-leaping algorithm for multi-objective no-wait flowshop scheduling
- Multi-objective bi-level programming for the energy-aware integration of flexible job shop scheduling and multi-row layout
- Solving distributed two-stage hybrid flowshop scheduling using a shuffled frog-leaping algorithm with memeplex grouping
This page was built for publication: An improved shuffled frog-leaping algorithm for flexible job shop scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1736634)