Decomposition algorithms for synchronous flow shop problems with additional resources and setup times
From MaRDI portal
(Redirected from Publication:1751897)
Recommendations
- Solution algorithms for synchronous flow shop problems with two dominating machines
- Flow shop-sequencing problem with synchronous transfers and makespan minimization
- Decomposition methods for reentrant flow shops with sequence-dependent setup times
- Decomposition approaches in permutation scheduling problems with application to the M-machine flow shop scheduling problems
- Synchronous flow shop scheduling with pliable jobs
Cites work
- A combinatorial property of Pallet-constrained two machine flow shop problem in minimizing makespan
- A survey of scheduling problems with setup times or costs
- Assembly line balancing in a mixed-model sequencing environment with synchronous transfers.
- Benchmarks for basic scheduling problems
- Complexity results for flow shop problems with synchronous movement
- Flow shop-sequencing problem with synchronous transfers and makespan minimization
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- Minimizing makespan in a pallet-constrained flowshop
- Scheduling subject to resource constraints: Classification and complexity
- Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem
- Solution algorithms for synchronous flow shop problems with two dominating machines
- Some new results in flow shop scheduling
Cited in
(8)- Decomposition methods for reentrant flow shops with sequence-dependent setup times
- A combinatorial analysis of the permutation and non-permutation flow shop scheduling problems
- Production, maintenance and resource scheduling: a review
- Mathematical modelling and heuristic approaches to job-shop scheduling problem with conveyor-based continuous flow transporters
- Solution algorithms for synchronous flow shop problems with two dominating machines
- Flowshop with additional resources during setups: mathematical models and a GRASP algorithm
- A unified solution framework for flexible job shop scheduling problems with multiple resource constraints
- Synchronous flow shop scheduling with pliable jobs
This page was built for publication: Decomposition algorithms for synchronous flow shop problems with additional resources and setup times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1751897)