A nearest neighbour extension to project duration forecasting with artificial intelligence
From MaRDI portal
Publication:1751933
DOI10.1016/J.EJOR.2016.11.018zbMATH Open1403.68247OpenAlexW2554894595MaRDI QIDQ1751933FDOQ1751933
Authors: Mathieu Wauters, Mario Vanhoucke
Publication date: 25 May 2018
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2016.11.018
Recommendations
- A simulation and evaluation of earned value metrics to forecast the project duration
- A methodology for forecasting knowledge work projects
- Adaptive metrics in the nearest neighbours method
- A linear Bayesian stochastic approximation to update project duration estimates
- Measuring time. Improving project performance using earned value management
Cites Work
- Greedy function approximation: A gradient boosting machine.
- Principal component analysis.
- Title not available (Why is that?)
- Bagging predictors
- Support-vector networks
- Nearest neighbor pattern classification
- Problems in the Analysis of Survey Data, and a Proposal
- Measuring time. Improving project performance using earned value management
- An evaluation of the adequacy of project network generators with systematically sampled networks
- Rangen: A random network generator for activity-on-the-node networks
- A simulation and evaluation of earned value metrics to forecast the project duration
- Critical-Path Planning and Scheduling: Mathematical Basis
- Bankruptcy prediction in banks and firms via statistical and intelligent techniques -- a review
- Optimal timing of project control points
- Developing activity duration specification limits for effective project control
- Forecasting with cue information: a comparison of multiple regression with alternative forecasting approaches
Cited In (4)
- A hybrid forecasting model to predict the duration and cost performance of projects with Bayesian networks
- An empirical project forecasting accuracy framework using project regularity
- Estimation of costs and durations of construction of urban roads using ANN and SVM
- A methodology for forecasting knowledge work projects
Uses Software
This page was built for publication: A nearest neighbour extension to project duration forecasting with artificial intelligence
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1751933)