Capital- and resource-constrained project scheduling with net present value optimization
DOI10.1016/J.EJOR.2016.07.019zbMATH Open1394.90285OpenAlexW2501972505MaRDI QIDQ1752257FDOQ1752257
Mario Vanhoucke, Pieter Leyman
Publication date: 24 May 2018
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://lirias.kuleuven.be/handle/123456789/629253
Approximation methods and heuristics in mathematical programming (90C59) Applications of mathematical programming (90C90) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Project scheduling with inventory constraints
- Principles of scatter search
- Scheduling subject to resource constraints: Classification and complexity
- Rangen: A random network generator for activity-on-the-node networks
- On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints
- Handbook of metaheuristics
- Project scheduling: The effects of problem structure on heuristic performance
- Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem
- A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows
- Project network models with discounted cash flows a guided tour through recent developments
- An iterative scheduling technique for resource-constrained project scheduling
- Resource-constrained project scheduling: A critical activity reordering heuristic
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
- Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective
- The discrete time/cost trade-off problem: Extensions and heuristic procedures
- A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows
- Cash Flows in Networks
- A population-based approach to the resource-constrained project scheduling problem
- Project Contracts and Payment Schedules: The Client's Problem
- Metaheuristics for multi-mode capital-constrained project payment scheduling
- Multi-mode project payment scheduling problems with bonus-penalty structure
- Simulated annealing and tabu search for multi-mode project payment scheduling
- On modelling payments in projects
- Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach
- A two stage search heuristic for scheduling payments in projects
- Scheduling project activities to maximize the net present value the case of linear time-dependent cash flows
- Maximizing the net present value of a project with linear time-dependent cash flows
- Progress payments in project scheduling problems.
- A steepest ascent approach to maximizing the net present value of projects
- A branch and bound algorithm for scheduling projects to maximize net present value: The case of time dependent, contingent cash flows
Cited In (13)
- Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty
- Investment decisions and sensitivity analysis: NPV-consistency of rates of return
- Considering project management activities for engineering design groups
- Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns
- A quantitative approach for the long-term assessment of railway rapid transit network construction or expansion projects
- Project selection and scheduling with uncertain net income and investment cost
- The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models
- Maximizing the net present value of a project under resource constraints using a Lagrangian relaxation based heuristic with tight upper bounds
- Risk assessment and optimal scheduling of serial projects
- Tabu search and simulated annealing for resource-constrained multi-project scheduling to minimize maximal cash flow gap
- Scheduling the construction of value and discount weighted trees for maximum net present value
- Title not available (Why is that?)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem
Uses Software
This page was built for publication: Capital- and resource-constrained project scheduling with net present value optimization
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1752257)