A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles
From MaRDI portal
(Redirected from Publication:1754041)
Recommendations
- MIP models for resource-constrained project scheduling with flexible resource profiles
- Resource-constrained project scheduling with flexible resource profiles in continuous time
- A metaheuristic approach to the resource constrained project scheduling with variable activity durations and convex cost functions
- A hybrid genetic algorithm for the resource-constrained project scheduling problem
- A hybrid metaheuristic for the resource-constrained project scheduling problem
Cites work
- scientific article; zbMATH DE number 3497315 (Why is no real title available?)
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- scientific article; zbMATH DE number 1300399 (Why is no real title available?)
- A priority-rule method for project scheduling with work-content constraints
- A self-adapting genetic algorithm for project scheduling under resource constraints
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- Handbook of metaheuristics
- Insertion techniques for static and dynamic resource-constrained project scheduling.
- MIP models for resource-constrained project scheduling with flexible resource profiles
- PSPLIB -- a project scheduling problem library
- Project scheduling with finite or infinite number of activity processing modes -- a survey
Cited in
(11)- Multi-parallel work centers scheduling optimization with shared or dedicated resources in low-volume low-variety production systems
- MIP models for resource-constrained project scheduling with flexible resource profiles
- Project scheduling with flexible resources: formulation and inequalities
- Scheduling resource-constrained projects with a flexible project structure
- A metaheuristic approach to the resource constrained project scheduling with variable activity durations and convex cost functions
- Resource-constrained project scheduling with flexible resource profiles in continuous time
- Project scheduling to minimize the makespan under flexible resource profiles and marginal diminishing returns of the resource
- Hybrid algorithm for project scheduling with capacity constraint
- Model and algorithm for human resource-constrained R\&D program scheduling optimization
- A metaheuristic solution approach for the time-constrained project scheduling problem
- An updated survey of variants and extensions of the resource-constrained project scheduling problem
This page was built for publication: A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1754041)