A three-phase algorithm for flowshop scheduling with blocking to minimize makespan
From MaRDI portal
Publication:1761237
DOI10.1016/J.COR.2012.02.020zbMATH Open1251.90196OpenAlexW2046579079MaRDI QIDQ1761237FDOQ1761237
Cheng Wu, Shiji Song, Jatinder N. D. Gupta, Cheng Wang
Publication date: 15 November 2012
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2012.02.020
priority rulepruning procedureflowshop scheduling with zero-buffer and blockingNEH-insertsimulated annealing with local searchthree-phase algorithm
Cites Work
- Title not available (Why is that?)
- Optimization by Simulated Annealing
- Sequencing of jobs in some production system
- Benchmarks for basic scheduling problems
- Flowshop scheduling research after five decades
- A review and classification of heuristics for permutation flow-shop scheduling with makespan objective
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
- A novel hybrid discrete differential evolution algorithm for blocking flow shop scheduling problems
- A branch-and-bound algorithm to minimize the makespan in a flowshop with blocking
- Optimal planning of part's machining on a number of machines
- Sequencing in an Assembly Line with Blocking to Minimize Cycle Time
- Flowshop sequencing problems with limited buffer storage
- Lower bounding schemes for flowshops with blocking in-process
- On the Flow-Shop Sequencing Problem with No Wait in Process†
- Minimizing Cycle Time in a Blocking Flowshop
- Complexity of flowshop scheduling problems with a new blocking constraint
Cited In (10)
- A variable block insertion heuristic for the blocking flowshop scheduling problem with total flowtime criterion
- Title not available (Why is that?)
- Constraint guided accelerated search for mixed blocking permutation flowshop scheduling
- Iterated greedy algorithms for the blocking flowshop scheduling problem with makespan criterion
- Two-machine flow shop scheduling problem with blocking, multi-task flexibility of the first machine, and preemption
- A new algorithm for minimizing makespan, Cmax, in blocking flow-shop problem through slowing down the operations
- Optimizing blocking flow shop scheduling problem with total completion time criterion
- A hybrid variable neighborhood search algorithm for solving the limited-buffer permutation flow shop scheduling problem with the makespan criterion
- Algorithms for three-machine flowshop scheduling problem to minimize makespan with uncertain processing times
- Estimation of distribution algorithm with path relinking for the blocking flow-shop scheduling problem
This page was built for publication: A three-phase algorithm for flowshop scheduling with blocking to minimize makespan
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1761237)