Flight gate scheduling with respect to a reference schedule
From MaRDI portal
Publication:1761900
DOI10.1007/S10479-010-0809-8zbMATH Open1251.90136OpenAlexW2107567322MaRDI QIDQ1761900FDOQ1761900
Authors: Ulrich Dorndorf, Florian Jaehn, Erwin Pesch
Publication date: 15 November 2012
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-010-0809-8
Recommendations
- Assigning arriving flights at an airport to the available gates
- Robust flight gate assignment
- Flight gate assignment and recovery strategies with stochastic arrival and departure times
- Rates of closed-bridge and crossing-collision oriented optimization model on aircraft-gate assignment and its heuristics
- Theoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy models
Deterministic scheduling theory in operations research (90B35) Discrete location and assignment (90B80)
Cites Work
- Recent research directions in automated timetabling
- A survey of search methodologies and automated system development for examination timetabling
- On the complexity of partitioning graphs into connected subgraphs
- Fast Clustering Algorithms
- Procedures for providing robust gate assignments for arriving aircrafts
- A heuristic approach for airport gate assignments for stochastic flight delays
- New heuristics for over-constrained flight to gate assignments
- Project scheduling with time windows. From theory to applications.
- Disruption management in flight gate scheduling
- Theoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy models
Cited In (11)
- Assigning arriving flights at an airport to the available gates
- Airport gate scheduling with time windows
- Flight gate assignment and recovery strategies with stochastic arrival and departure times
- Search algorithms for improving the Pareto front in a timetabling problem with a solution network-based robustness measure
- Theoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy models
- Exact and heuristic approaches to the airport stand allocation problem
- Fixed set search applied to the clique partitioning problem
- Solution of airport gate reassignment problem under uncertain environment
- Disruption management in flight gate scheduling
- Title not available (Why is that?)
- Robust flight gate assignment
This page was built for publication: Flight gate scheduling with respect to a reference schedule
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1761900)