Heuristic solutions to the long-term unit commitment problem with cogeneration plants
DOI10.1016/J.COR.2011.03.018zbMATH Open1251.90020OpenAlexW2131005515MaRDI QIDQ1761973FDOQ1761973
Authors: Niels Hvidberg Kjeldsen, Marco Chiarandini
Publication date: 15 November 2012
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2011.03.018
Recommendations
- Two-stage heuristic approach for solving the long-term unit commitment problem with hydro-thermal coordination
- A heuristic for the long-term electricity generation planning problem using the Bloom and Gallant formulation
- scientific article; zbMATH DE number 1308831
- A long-term unit commitment problem with hydrothermal coordination for economic and emission control in large-scale electricity systems
- A variant of the dynamic programming algorithm for unit commitment of combined heat and power systems
- scientific article; zbMATH DE number 1264433
- Fix-and-optimize procedures for solving the long-term unit commitment problem with pumped storages
- Solving the unit commitment problem by a unit decommitment method
local searchmixed integer programming heuristicsenergy planningunit commitment with cogeneration plants
Approximation methods and heuristics in mathematical programming (90C59) Computational methods for problems pertaining to operations research and mathematical programming (90-08) Mixed integer programming (90C11) Discrete location and assignment (90B80)
Cites Work
- Title not available (Why is that?)
- Production Planning by Mixed Integer Programming
- Local branching
- Conflict analysis in mixed integer programming
- Title not available (Why is that?)
- Solving Nonlinear Single-Unit Commitment Problems with Ramping Constraints
- Title not available (Why is that?)
- Short-Term Scheduling of Thermal-Electric Generators Using Lagrangian Relaxation
- Efficient algorithms for combined heat and power production planning under the deregulated electricity market
- An Application of Lagrangian Relaxation to Scheduling in Power-Generation Systems
- An efficient linear programming algorithm for combined heat and power production.
- An efficient linear model and optimisation algorithm for multi-site combined heat and power production
Cited In (6)
- Fix-and-optimize procedures for solving the long-term unit commitment problem with pumped storages
- VNS based heuristic for solving the unit commitment problem
- Two-stage heuristic approach for solving the long-term unit commitment problem with hydro-thermal coordination
- A long-term unit commitment problem with hydrothermal coordination for economic and emission control in large-scale electricity systems
- Operational planning of combined heat and power plants through genetic algorithms for mixed 0-1 nonlinear programming
- Coordination between long-term decision process and day-ahead unit commitment in deregulated markets: a fuzzy hierarchical bi-level modeling approach
Uses Software
This page was built for publication: Heuristic solutions to the long-term unit commitment problem with cogeneration plants
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1761973)