Development of hybrid evolutionary algorithms for production scheduling of hot strip mill
From MaRDI portal
(Redirected from Publication:1761983)
Recommendations
- Production scheduling optimization algorithm for the hot rolling processes
- A multi-objective hot-rolling scheduling problem in the compact strip production
- A mathematical model and two-stage heuristic for hot rolling scheduling in compact strip production
- Multi-objective hybrid optimization of lot scheduling for bar mill process
- Scheduling a hot rolling mill
Cites work
- scientific article; zbMATH DE number 867338 (Why is no real title available?)
- A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron \& Steel Complex
- A review of planning and scheduling systems and methods for integrated steel production
- Generalized extremal optimization: an application in heat pipe design
- Machine scheduling with earliness, tardiness and non-execution penalties
- Modeling rolling batch planning as vehicle routing problem with time windows.
- Nature's way of optimizing
- Production scheduling optimization algorithm for the hot rolling processes
- Rolling horizon scheduling in a rolling-mill
- Scheduling in a continuous galvanizing line
- Steel production schedule generation
- The hot strip mill production scheduling problem: A tabu search approach
- The prize collecting traveling salesman problem
Cited in
(6)- Production scheduling optimization algorithm for the hot rolling processes
- Modeling and application for rolling scheduling problem based on TSP
- scientific article; zbMATH DE number 7365935 (Why is no real title available?)
- Multi-objective hybrid optimization of lot scheduling for bar mill process
- INEH-VNS algorithm solved automatic production system scheduling problem under just-in-time environment
- Evolutionary multi-objective design of autoencoders for compact representation of histopathology whole slide images
This page was built for publication: Development of hybrid evolutionary algorithms for production scheduling of hot strip mill
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1761983)