Scheduling tasks on a flexible manufacturing machine to minimize tool change delays
From MaRDI portal
(Redirected from Publication:1767682)
Recommendations
- Scheduling with tool changes to minimize total completion time under controllable machining conditions
- Scheduling flexible machining and assembly systems
- Scheduling methods for a class of flexible manufacturing systems
- Minimizing maximum tardiness in single FMS machine scheduling with tool changes
- Parallel Machine Scheduling In A Flexible Manufacturing System
- Scheduling a Flexible Batching Machine
- Simultaneous scheduling of workpieces, fixtures and cutting tools within flexible machining cells
- Adaptive scheduling and tool flow control in flexible job shops
- A feasible schedule for parallel assembly tasks in flexible manufacturing systems
- Loading and scheduling for flexible manufacturing systems with controllable processing times
Cites work
- scientific article; zbMATH DE number 1600182 (Why is no real title available?)
- scientific article; zbMATH DE number 1640601 (Why is no real title available?)
- scientific article; zbMATH DE number 1302193 (Why is no real title available?)
- scientific article; zbMATH DE number 6157240 (Why is no real title available?)
- Minimizing setups in ordered sets of fixed width
- Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches
- Models Arising from a Flexible Manufacturing Machine, Part II: Minimization of the Number of Switching Instants
- New trends in machine scheduling
- On minimizing the jump number for interval orders
- Scheduling of resource tasks
- The Complexity of Some Problems on Subsequences and Supersequences
- The Jump Number of Dags and Posets: An Introduction
- The shortest common supersequence problem over binary alphabet is NP- complete
Cited in
(9)- Assignment of tools to machines in a flexible manufacturing system
- Single-machine scheduling with workload-dependent tool change durations and equal processing time jobs to minimize total completion time
- Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance
- A review of some issues and identification of some barriers in the implementation of FMS
- scientific article; zbMATH DE number 5310148 (Why is no real title available?)
- Anytime heuristic schedule repair in manufacturing industry
- Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance
- A dynamic scheduling algorithm for singe-arm two-cluster tools with flexible processing times
- Minimizing maximum tardiness in single FMS machine scheduling with tool changes
This page was built for publication: Scheduling tasks on a flexible manufacturing machine to minimize tool change delays
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1767682)