Workforce planning in a lotsizing mail processing problem
DOI10.1016/J.COR.2004.04.011zbMATH Open1090.90529OpenAlexW1980832948MaRDI QIDQ1781576FDOQ1781576
Authors: Pedro Martins, Jacinto Nunes, Joaquim J. Júdice
Publication date: 27 June 2005
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/10316/4622
Recommendations
- Workforce planning at USPS mail processing and distribution centers using stochastic optimization
- Generating labor requirements and rosters for mail handlers using simulation and optimization
- Review of models and methodology for scheduling problems in USPS mail processing and distribution centres
- Equipment scheduling problem under disruptions in mail processing and distribution centres
- Workforce Planning in Mixed Model Assembly Systems
- A class of manpower scheduling problems
- Scheduling staff using mixed integer programming
- Integer programming to schedule a hierarchical workforce with variable demands
- Optimal staffing for cyclically scheduled processes
- Workforce scheduling and routing problems: literature survey and computational study
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35) Mixed integer programming (90C11)
Cites Work
- Modelling practical lot-sizing problems as mixed-integer programs
- Title not available (Why is that?)
- A generalized linear programming model for nurse scheduling
- Staff scheduling and rostering: a review of applications, methods and models.
- Models and algorithms for a staff scheduling problem
- On Manpower Scheduling Algorithms
- Title not available (Why is that?)
- A Column Generation Approach for Large-Scale Aircrew Rostering Problems
- Solving Multi-Item Lot-Sizing Problems Using Strong Cutting Planes
- Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing
- Lot sizing and scheduling -- survey and extensions
- Title not available (Why is that?)
- An enhanced rostering model for airline crews
- Algorithms for railway crew management
- Staff scheduling at the United States postal Service
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
- Airline Crew Scheduling: A New Formulation and Decomposition Algorithm
- Improving Personnel Scheduling at Airline Stations
- A comparative evaluation of modeling approaches to the labor shift scheduling problem
- Integrated simulation, heuristic and optimisation approaches to staff scheduling
- The Operator-Scheduling Problem: A Network-Flow Approach
- A greedy-based neighborhood search approach to a nurse rostering problem.
- Solving multi-item lot-sizing problems with an MIP solver using classification and reformulation
- bc — prod: A Specialized Branch-and-Cut System for Lot-Sizing Problems
- Multilevel capacitated lotsizing complexity and LP-based heuristics
- Development of a workforce management system for a customer hotline service
- Solving Large-Scale Tour Scheduling Problems
- Multi-level lot-sizing problem: Evaluation of a simulated-annealing heuristic
- Proportional lot sizing and scheduling: Some extensions
- A heuristic for dynamic multi-item multi-level capacitated lotsizing for general product structures
- A Polyhedral Approach to Simplified Crew Scheduling and Vehicle Scheduling Problems
- Title not available (Why is that?)
Cited In (8)
- Workforce planning at USPS mail processing and distribution centers using stochastic optimization
- Review of models and methodology for scheduling problems in USPS mail processing and distribution centres
- Workforce planning in the printing industry
- Generating labor requirements and rosters for mail handlers using simulation and optimization
- Equipment scheduling problem under disruptions in mail processing and distribution centres
- Efficient shift scheduling in the retail sector through two-stage optimization
- A three-phase matheuristic for the packaging and shipping problem
- Equipment Selection and Machine Scheduling in General Mail Facilities
Uses Software
This page was built for publication: Workforce planning in a lotsizing mail processing problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1781576)