Unary NP-hardness of minimizing total weighted tardiness with generalized due dates
From MaRDI portal
Publication:1785477
DOI10.1016/J.ORL.2015.12.006zbMATH Open1408.90128OpenAlexW2191379429MaRDI QIDQ1785477FDOQ1785477
Authors: Yuan Gao, Jinjiang Yuan
Publication date: 28 September 2018
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.orl.2015.12.006
Recommendations
- Unary NP-hardness of minimizing the total deviation with generalized or assignable due dates
- Unary NP-hardness of single-machine scheduling to minimize the total tardiness with deadlines
- scientific article; zbMATH DE number 4172724
- Unary NP-hardness of minimizing the number of tardy jobs with deadlines
- Minimizing Total Tardiness on One Machine is NP-Hard
Deterministic scheduling theory in operations research (90B35) Abstract computational complexity for mathematical programming problems (90C60)
Cites Work
Cited In (15)
- Unary NP-hardness of single-machine scheduling to minimize the total tardiness with deadlines
- Unary NP-hardness of minimizing the number of tardy jobs with deadlines
- A single machine scheduling with generalized and periodic due dates to minimize total deviation
- Order acceptance and scheduling with delivery under generalized parameters
- Just-in-time scheduling with generalized due dates and identical due date intervals
- Single-machine scheduling with periodic due dates to minimize the total earliness and tardy penalty
- Scheduling with generalized and periodic due dates under single- and two-machine environments
- Strong NP-hardness of minimizing total deviation with generalized and periodic due dates
- Unary NP-hardness of minimizing the total deviation with generalized or assignable due dates
- Minimizing tardiness scheduling measures with generalized due-dates and a maintenance activity
- Min–max version of single-machine scheduling with generalized due dates under scenario-based uncertainty
- Single machine scheduling with rejection and generalized parameters
- On the tractability of hard scheduling problems with generalized due-dates with respect to the number of different due-dates
- Minimizing Total Tardiness on One Machine is NP-Hard
- Two-machine ordered flow shop scheduling with generalized due dates
This page was built for publication: Unary NP-hardness of minimizing total weighted tardiness with generalized due dates
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1785477)