Permutation schedules for a two-machine flow shop with storage
From MaRDI portal
Publication:1785731
DOI10.1016/j.orl.2015.12.012zbMath1408.90126OpenAlexW2216432406MaRDI QIDQ1785731
Publication date: 1 October 2018
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.orl.2015.12.012
Analysis of algorithms and problem complexity (68Q25) Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Related Items
On a borderline between the NP-hard and polynomial-time solvable cases of the flow shop with job-dependent storage requirements ⋮ On permutation schedules for two-machine flow shops with buffer constraints and constant processing times on one machine ⋮ An iterated local search algorithm for the two-machine flow shop problem with buffers and constant processing times on one machine ⋮ Two-machine flow shops with an optimal permutation schedule under a storage constraint ⋮ A 5-parameter complexity classification of the two-stage flow shop scheduling problem with job dependent storage requirements ⋮ Efficient Lagrangian heuristics for the two-stage flow shop with job dependent buffer requirements
Cites Work
- A two-machine flowshop problem with processing time-dependent buffer constraints-an application in multimedia presentations
- Permutation vs. non-permutation flow shop schedules
- Quantity-based buffer-constrained two-machine flowshop problem: active and passive prefetch models for multimedia applications
- Scheduling
- Unnamed Item
- Unnamed Item
- Unnamed Item