Stochastically minimizing total flowtime in flowshops with no waiting space
From MaRDI portal
Publication:1806645
DOI10.1016/S0377-2217(97)00438-4zbMATH Open0933.90024OpenAlexW2022113174MaRDI QIDQ1806645FDOQ1806645
Publication date: 8 November 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(97)00438-4
Recommendations
Cites Work
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
- Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness
- Flowshop and Jobshop Schedules: Complexity and Approximation
- Flowshop/no-idle or no-wait scheduling to minimize the sum of completion times
- Stochastic Single Machine Scheduling with Quadratic Early-Tardy Penalties
- Two-machine ordered flowshop scheduling under random breakdowns
- Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns
- Heuristic algorithms for continuous flow-shop problem
- Solvable Cases of the No-wait Flow-shop Scheduling Problem
- Single-machine scheduling subject to stochastic breakdowns
- Minimizing the Expected Makespan in Stochastic Flow Shops
- Stochastically minimizing the makespan in flow shops
- Scheduling in stochastic flowshops with independent setup, processing and removal times
- Title not available (Why is that?)
- Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function
- Schedulingn nonoverlapping jobs and two stochastic jobs in a flow shop
- On Pinedo's Conjecture for Scheduling in a Stochastic Flow Shop
- Title not available (Why is that?)
Cited In (7)
- Stochastically minimizing total penalty costs in stochastic flow shops
- Job flow-time in a job shop subject to machine breakdowns with applications in modelling job shop in-process inventories
- Title not available (Why is that?)
- A heuristic approach to minimize expected makespan in open shops subject to stochastic processing times and failures
- Schedule execution for two-machine flow-shop with interval processing times
- Two-machine stochastic flow shops with blocking and the traveling salesman problem
- Minimizing total tardiness in no-wait flowshops
This page was built for publication: Stochastically minimizing total flowtime in flowshops with no waiting space
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1806645)