Multi-plant production planning in capacitated self-configuring two-stage serial systems
DOI10.1016/S0377-2217(99)00146-0zbMATH Open0948.90057OpenAlexW2046391517MaRDI QIDQ1806748FDOQ1806748
Publication date: 29 November 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(99)00146-0
Recommendations
- Multifacility in-series production-planning model with capacity constraints
- Production capacity planning and control in multi-stage manufacturing
- Modeling multiple stage manufacturing systems with generalized costs and capacity issues
- Managing production with flexible capacity deployment for serial multi-stage manufacturing systems
- Multi-stage lot sizing in a serial production system
capacity allocation problemcapacitated master production planningmixed \(\{0,1\}\) linear programmingmulti-plant manufacturing
Linear programming (90C05) Transportation, logistics and supply chain management (90B06) Production models (90B30)
Cites Work
- Title not available (Why is that?)
- Title not available (Why is that?)
- Coordinated supply chain management
- Coordination of production and distribution planning
- A Production Line that Balances Itself
- Self-Buffering, Self-Balancing, Self-Flushing Production Lines
- Multi-Item Single-Level Capacitated Dynamic Lot-Sizing Heuristics: A General Review
Cited In (7)
- Price negotiation for capacity sharing in a two-factory environment using genetic algorithm
- Optimizing multi-stage production for an assembly-type supply chain with unequal sized batch shipments
- Combining possibilistic linear programming and fuzzy AHP for solving the multi-objective capacitated multi-facility location problem
- Heuristic factory planning algorithm for advanced planning and scheduling
- Decomposition based hybrid VNS-TS algorithm for distributed parallel factories scheduling with virtual corporation
- Optimal inventory policies for serial-type and assembly-type supply chains with equal sized batch
- Advanced planning and scheduling based on precedence and resource constraints for e-plant chains
This page was built for publication: Multi-plant production planning in capacitated self-configuring two-stage serial systems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1806748)