Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs
From MaRDI portal
Publication:1807950
DOI10.1016/S0377-2217(98)00003-4zbMATH Open0938.90033OpenAlexW2054766195MaRDI QIDQ1807950FDOQ1807950
Authors: Hossein M. Soroush
Publication date: 24 November 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(98)00003-4
Recommendations
- The stochastic single machine scheduling problem with earliness and tardiness costs
- Optimal due-date assignment for a single machine sequencing problem with random processing times
- Single machine scheduling with stochastic processing times or stochastic due-date to minimize the number of early and tardy jobs
- Optimal due-date determination and sequencing with random processing times
- Optimal Due-Date Determination and Sequencing of n Jobs on a Single Machine
- On a single-machine optimal constant due-date assignment and sequencing problem
Cites Work
- Title not available (Why is that?)
- Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem
- Survey of scheduling research involving due date determination decisions
- Sequencing with Earliness and Tardiness Penalties: A Review
- Lot Sizes, Lead Times and In-Process Inventories
- Sequencing jobs on a single machine with a common due data and stochastic processing times
- The stochastic single machine scheduling problem with earliness and tardiness costs
- Note—On Baluts Algorithm and NP-Completeness for a Chance-Constrained Scheduling Problem
- On the Assignment of Optimal Due Dates
- Title not available (Why is that?)
- Scheduling to Minimize the Number of Late Jobs When Set-Up and Processing Times are Uncertain
- Minimising Waiting Time Variance in the Single Machine Problem
- Minimizing the average deviation of job completion times about a common due date
- Optimal Single-Machine Scheduling with Earliness and Tardiness Penalties
- Manufacturing systems with forbidden early order departure
- Optimal Due-Date Determination and Sequencing of n Jobs on a Single Machine
- An algorithm for the CON due-date determination and sequencing problem
- Analytical determination of optimal TWK due-dates in a job shop
- A Simulation Study of Operating Policies in a Hypothetical Dual-Constrained Job Shop
- Optimal due-date assignment for a single machine sequencing problem with random processing times
- Optimal assignment of slack due-dates and sequencing of jobs with random processing times on a single machine
Cited In (32)
- Trading off due-date tightness and job tardiness in a basic scheduling model
- Safe scheduling: Setting due dates in single-machine problems
- Setting due dates in a stochastic single machine environment
- Minimizing earliness and tardiness costs in stochastic scheduling
- Single machine due date assignment scheduling problem with precedence constraints and controllable processing times in fuzzy environment
- Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times
- The control of a serial-capacitated production line for cost optimization
- Dynamic machining control and scheduling for multiple production projects in a deterministic period
- Production planning of a robot-served machine under probabilistic market demand and fixed selling time
- Quantitative production scheme model for an automated manufacturing system
- A stochastic approach for the single-machine scheduling problem to minimize total expected cost with client-dependent tardiness costs
- Optimal approach for dynamic production control and workforce allocation of machining project
- Due-window assignment scheduling problem with stochastic processing times
- Strategic production planning of an automated manufacturing system through market forecasting
- Optimal sequencing using a scheduling heuristic
- Impact of priority sequencing decisions on on-time probability and expected tardiness of orders in make-to-order production systems with external due-dates
- Solving a stochastic single machine problem with initial idle time and quadratic objective
- Due date assignment for multistage assembly systems
- Setting optimal due dates in a basic safe-scheduling model
- Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time
- Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness
- Modelling complex assemblies as a queueing network for lead time control
- A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times
- Minimizing total completion time in a two-machine no-wait flowshop with uncertain and bounded setup times
- Optimal due-date assignment for a single machine sequencing problem with random processing times
- Significantly improved dominance relation for no-wait flowshop scheduling problems with uncertain setup times
- Setting due dates to minimize the total weighted possibilistic mean value of the weighted earliness-tardiness costs on a single machine
- Improving delivery reliability by a new due-date setting rule
- Bi-objective single machine scheduling problem with stochastic processing times
- Johnson's problem with stochastic processing times and optimal service level
- An approach to optimum production policy of automated manufacturing project
- Minimizing the weighted number of early and tardy jobs in a stochastic single machine scheduling problem
This page was built for publication: Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1807950)