Progress payments in project scheduling problems.
From MaRDI portal
Publication:1812008
DOI10.1016/S0377-2217(02)00452-6zbMath1083.90516OpenAlexW2017767740MaRDI QIDQ1812008
Mario Vanhoucke, Willy S. Herroelen, Erik L. Demeulemeester
Publication date: 18 June 2003
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(02)00452-6
Applications of mathematical programming (90C90) Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35)
Related Items
The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models ⋮ Which fuzzy ranking method is best for maximizing fuzzy net present value? ⋮ Capital- and resource-constrained project scheduling with net present value optimization ⋮ Multi-mode project payment scheduling problems with bonus-penalty structure ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem ⋮ Simulated annealing and tabu search for multi-mode project payment scheduling
Cites Work
- The scheduling of activities to maximize the net present value of projects
- Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
- A comparison of stochastic scheduling rules for maximizing project net present value
- Computational experience with an optimal procedure for the scheduling of activities to maximize the net present value of projects
- Scheduling projects to maximize net present value -- the case of time-dependent, contingent cash flows
- A tabu search procedure for the resource constrained project scheduling problem with discounted cash flows
- Connectionist approaches for solver selection in constrained project scheduling
- Scheduling a project to maximize its net present value: An integer programming approach
- Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach
- The resource constrained project scheduling problem with multiple crashable modes: An exact solution method
- On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints
- Deterministic methods in constrained global optimization: Some recent advances and new fields of application
- Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach
- A branch and bound algorithm for scheduling projects to maximize net present value: The case of time dependent, contingent cash flows
- Scheduling project activities to maximize the net present value the case of linear time-dependent cash flows
- On modelling payments in projects
- A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows
- Performance of the heuristic procedures for constrained projects with progress payments
- Heuristic scheduling of resource-constrained projects with cash flows
- Optimal Facility Location with Concave Costs
- Maximizing the net present value of a project with linear time-dependent cash flows
- An Algorithm for Separable Nonconvex Programming Problems
- Cash Flows in Networks
- An Experimental Investigation and Comparative Evaluation of Production Line Balancing Techniques
- The payment scheduling problem
- Project Scheduling with Discounted Cash Flows and Progress Payments
- An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem