Hierarchical production control for a flow shop with dynamic setup changes and random machine breakdowns
DOI10.1007/BF01539732zbMATH Open0858.90065MaRDI QIDQ1814871FDOQ1814871
Authors: Yanyan Li
Publication date: 31 October 1996
Published in: OR Spektrum (Search for Journal in Brave)
Recommendations
- Hierarchical production control in a stochastic \(N\)-machine flowshop with limited buffers
- Hierarchical production control in a stochastic \(N\)-machine flowshop with long-run average cost.
- Hierarchical control of production with stochastic demand in manufacturing systems
- Hierarchical production and setup scheduling in stochastic manufacturing systems
- Hierarchical production control in dynamic stochastic jobshops with long-run average cost
- Hierarchical controls in stochastic manufacturing systems with machines in tandem
- Hierarchical production control in a stochastic manufacturing system with long-run average cost
dynamic programmingfailureproduction schedulingrepairmanufacturing systemtwo machinesintermediate buffershierarchical control structuretime-to-repairdynamic setup changeoptimal control policy structurestochastic flow-shoptime-to-failure
Reliability, availability, maintenance, inspection in operations research (90B25) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Cites Work
- Title not available (Why is that?)
- Dynamic Programming and Minimum Principles for Systems with Jump Markov Disturbances
- Optimal control of production rate in a failure prone manufacturing system
- The discrete lot-sizing and scheduling problem
- Scheduling manufacturing systems with work-in-process inventory control: multiple-part-type systems
- Dynamic setup scheduling and flow control in manufacturing systems
Cited In (2)
This page was built for publication: Hierarchical production control for a flow shop with dynamic setup changes and random machine breakdowns
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1814871)