Optimal production and setup control of a dynamic two-product manufacturing system: Analytical solution
From MaRDI portal
Publication:1816625
DOI10.1016/0895-7177(96)00100-8zbMATH Open0858.90067OpenAlexW2082239198WikidataQ127213042 ScholiaQ127213042MaRDI QIDQ1816625FDOQ1816625
Authors: Mohsen Elhafsi, Sherman X. Bai
Publication date: 11 December 1996
Published in: Mathematical and Computer Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0895-7177(96)00100-8
Recommendations
- Optimal production control of a dynamic two-product manufacturing system with setup costs and setup times
- Steady state solution of optimal production control of a dynamic four-product manufacturing system with setup costs and setup time
- Steady state solution of optimal production control of a dynamic five-product manufacturing system with setup costs and setup time
- Transient and steady-state analysis of a manufacturing system with setup changes
- Optimal production and setup scheduling: A one-machine, two-product system
Cites Work
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- Economic Lot Scheduling for Multiple Products on Parallel Identical Processors
- A Review of Production Scheduling
- Dynamic setup scheduling and flow control in manufacturing systems
- Dynamic instabilities and stabilization methods in distributed real-time scheduling of manufacturing systems
- Stable, distributed, real-time scheduling of flexible manufacturing/assembly/diassembly systems
- Optimal production and setup control of a dynamic two-product manufacturing system: Analytical solution
- Determination of economic production quantities for a two-product single machine system
- Design and operation of manufacturing systems: A controls-based synthesis
- Hierarchical production control for a flow shop with dynamic setup changes and random machine breakdowns
- Transient and steady-state analysis of a manufacturing system with setup changes
Cited In (14)
- Steady state solution of optimal production control of a dynamic five-product manufacturing system with setup costs and setup time
- Optimal Control of a Two-Station Tandem Production/Inventory System
- Optimal production rates in a deterministic two-product manufacturing system
- Optimal control of production processes with variable execution times
- Scheduling concurrent production over a finite planning horizon: Polynomially solvable cases
- Optimal production control of a dynamic two-product manufacturing system with setup costs and setup times
- One-machine n-part-type optimal setup scheduling: analytical characterization of switching surfaces
- Optimal scheduling of parallel machines with constrained resources
- Exact analysis of the joint production quantity-quality of two-station stable tandem manufacturing system with restricted capacity
- Numerical investigation of optimal policies for production flow control and set-up scheduling: Lessons from two-part-type failure-prone FMSs
- Optimal production and setup control of a dynamic two-product manufacturing system: Analytical solution
- Steady state solution of optimal production control of a dynamic four-product manufacturing system with setup costs and setup time
- Optimal production and setup scheduling: A one-machine, two-product system
- Optimal Manufacturing of a Two Product Mix
This page was built for publication: Optimal production and setup control of a dynamic two-product manufacturing system: Analytical solution
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1816625)