A note on minimum makespan assembly plans
From MaRDI portal
Publication:1848367
DOI10.1016/S0377-2217(01)00295-8zbMATH Open1082.90524OpenAlexW2019071454MaRDI QIDQ1848367FDOQ1848367
Giorgio Gallo, Maria Grazia Scutellà
Publication date: 20 November 2002
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(01)00295-8
Recommendations
- Assembly-line scheduling with concurrent operations and parallel machines
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- scientific article; zbMATH DE number 4072689
- scientific article; zbMATH DE number 4012297
- Scheduling lots of dependent unit-time operations on identical machines to minimize schedule length
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
Cited In (4)
This page was built for publication: A note on minimum makespan assembly plans
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1848367)