A search heuristic for the sequence-dependent economic lot scheduling problem
From MaRDI portal
Publication:1848619
DOI10.1016/S0377-2217(01)00265-XzbMATH Open0998.90037MaRDI QIDQ1848619FDOQ1848619
Authors: Bret J. Wagner, Darwin J. Davis
Publication date: 13 November 2002
Published in: European Journal of Operational Research (Search for Journal in Brave)
Recommendations
- Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes
- Two heuristics for the economic lot scheduling problem: An experimental study
- Hybrid genetic algorithm for the economic lot-scheduling problem
- New heuristics for solving the economic lot scheduling problem with reworks
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35) Combinatorial optimization (90C27)
Cites Work
- Maximizing Submodular Set Functions: Formulations and Analysis of Algorithms
- Title not available (Why is that?)
- An Effective Heuristic Algorithm for the Traveling-Salesman Problem
- The use of genetic algorithms to solve the economic lot size scheduling problem
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- A Dynamic Programming Approach to a Lot Size Scheduling Problem
- Title not available (Why is that?)
- Lot Sizing and Sequencing for N Products on One Facility
- Title not available (Why is that?)
- The Cyclic Lot Scheduling Problem with Sequence-Dependent Setups
Cited In (13)
- New heuristics for solving the economic lot scheduling problem with reworks
- Analysis of the feasible domain of ELSP problems based on hybrid algorithms
- A scheduling policy for adjusting economic lot quantities to a feasible solution
- Discrete lot sizing and scheduling using product decomposition into attributes
- A profit-maximizing economic lot scheduling problem with price optimization
- On the part inventory model sequencing problem: complexity and beam search heuristic
- A common cycle approach for solving the economic lot and inspection scheduling problem
- Economical production and transshipment policy for coordinating multiple production sites
- Two heuristics for the economic lot scheduling problem: An experimental study
- Solving the economic lot scheduling problem with multiple facilities in parallel using the time-varying lot sizes approach
- Planning of multi-product pipelines by economic lot scheduling models
- The Cyclic Lot Scheduling Problem with Sequence-Dependent Setups
- A production scheduling heuristic for an electronics manufacturer with sequence-dependent setup costs
Uses Software
This page was built for publication: A search heuristic for the sequence-dependent economic lot scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1848619)