A production planning model for an unreliable production facility: case of finite horizon and single demand
From MaRDI portal
Publication:1848632
DOI10.1016/S0377-2217(01)00326-5zbMATH Open1073.90500OpenAlexW3124395777MaRDI QIDQ1848632FDOQ1848632
Authors: Mohsen Elhafsi
Publication date: 13 November 2002
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(01)00326-5
Recommendations
- Optimal lot sizing in an unreliable two-stage serial production-inventory system
- Production lot sizing in failure prone two-stage serial systems
- Optimal design of unreliable production--inventory systems with variable production rate
- Two-stage production with unreliable machine and finite working hour capacity
- A PRODUCTION PLANNING MODEL FOR MULTI-PRODUCT FACILITIES
Cites Work
- A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach
- Dynamic version of the economic lot size model
- Title not available (Why is that?)
- Deterministic Production Planning with Concave Costs and Capacity Constraints
- Optimal Inventory Policies for Assembly Systems Under Random Demands
- Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems
- An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints
- The Deterministic Dynamic Product Cycling Problem
- Title not available (Why is that?)
- Production scheduling and sequencing for multi-stage production systems
Cited In (4)
- Two-stage production plan of probabilistic market demand with unreliable machines and obtainable working hour capacity
- Available-to-promise modeling for multi-plant manufacturing characterized by lack of homogeneity in the product: an illustration of a ceramic case
- Inventory models for imperfect production and inspection processes with various inspection options under one-time and continuous improvement investment
- Two-stage production with unreliable machine and finite working hour capacity
This page was built for publication: A production planning model for an unreliable production facility: case of finite horizon and single demand
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1848632)