Scheduling continuous casting of aluminum using a multiple objective ant colony optimization metaheuristic
From MaRDI portal
Publication:1848643
DOI10.1016/S0377-2217(01)00329-0zbMath1073.90512OpenAlexW2029006739MaRDI QIDQ1848643
Marc Gravel, Caroline Gagné, Wilson L. Price
Publication date: 13 November 2002
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(01)00329-0
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Combinatorial optimization (90C27) Case-oriented studies in operations research (90B90)
Related Items (18)
A branch and bound algorithm of the single machine schedule with sequence dependent setup times for minimizing total tardiness ⋮ A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness ⋮ A taxonomy and an empirical analysis of multiple objective ant colony optimization algorithms for the bi-criteria TSP ⋮ Hybrids of Constructive Metaheuristics and Constraint Programming: A Case Study with ACO ⋮ Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm ⋮ Metaheuristics: A Canadian Perspective ⋮ Multiple colony ant algorithm for job-shop scheduling problem ⋮ A unified framework for population-based metaheuristics ⋮ Scheduling continuous aluminium casting lines ⋮ Ant colony optimization system for a multi-quantitative and qualitative objective job-shop parallel-machine-scheduling problem ⋮ Pareto memetic algorithm for multiple objective optimization with an industrial application ⋮ Ant colony optimization for the job rotation scheduling problem ⋮ A modified ant colony system for solving the travelling salesman problem with time windows ⋮ ACS-TS: Train scheduling using ant colony system ⋮ Approximative solution methods for multiobjective combinatorial optimization. With discussion and a rejoinder by the authors. ⋮ Bi-objective ant colony optimization approach to optimize production and maintenance scheduling ⋮ A framework for determining MIMO process parameters by a neuro-DM&ACO approach ⋮ Solving real car sequencing problems with ant colony optimization
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Multiple and bicriteria scheduling: A literature survey
- A neural network model for scheduling problems
- The job shop scheduling problem: Conventional and new solution techniques
- Scheduling jobs on parallel machines with sequence-dependent setup times
- Scheduling in a sequence dependent setup environment with genetic search
- Some thoughts on combinatorial optimisation
- Genetic multi-criteria approach to flexible line scheduling
- A tabu search approach to machine scheduling
- Exploiting process plan flexibility in production scheduling: A multi-objective approach
- A comparison of neighborhood search techniques for multi-objective combinatorial problems
- Minimizing Total Tardiness on One Machine is NP-Hard
- Computational Complexity of Discrete Optimization Problems
- A competitive neural network approach to multi-objective FMS scheduling
- Integration of inductive learning and neural networks for multi-objective FMS scheduling
- A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling
- Exploring a Multicriteria Approach to Production Scheduling
This page was built for publication: Scheduling continuous casting of aluminum using a multiple objective ant colony optimization metaheuristic