Makespan estimation and order acceptance in batch process industries when processing times are uncertain
From MaRDI portal
Publication:1864434
DOI10.1007/s00291-002-0108-0zbMath1028.90518OpenAlexW2158249976WikidataQ57538693 ScholiaQ57538693MaRDI QIDQ1864434
J. Will M. Bertrand, Jan C. Fransoo, Cristina V. Ivanescu
Publication date: 18 March 2003
Published in: OR Spectrum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s00291-002-0108-0
Related Items (10)
Pooling heterogeneous products for manufacturing environments ⋮ A hybrid policy for order acceptance in batch process industries ⋮ Measures of problem uncertainty for scheduling with interval processing times ⋮ Order acceptance with weighted tardiness ⋮ A filtered-beam-search-based heuristic algorithm for flexible job-shop scheduling problem ⋮ Evaluation of the quantiles and superquantiles of the makespan in interval valued activity networks ⋮ Permutation flow shop scheduling with order acceptance and weighted tardiness ⋮ Non-permutation flow shop scheduling with order acceptance and weighted tardiness ⋮ Order acceptance using genetic algorithms ⋮ Integrated production planning and order acceptance under uncertainty: a robust optimization approach
This page was built for publication: Makespan estimation and order acceptance in batch process industries when processing times are uncertain