On two single machine scheduling problems with fuzzy processing times and fuzzy due dates
From MaRDI portal
Publication:1869711
DOI10.1016/S0377-2217(02)00561-1zbMATH Open1037.90025MaRDI QIDQ1869711FDOQ1869711
Authors: Adam Kasperski, Stefan Chanas
Publication date: 28 April 2003
Published in: European Journal of Operational Research (Search for Journal in Brave)
Recommendations
Deterministic scheduling theory in operations research (90B35) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Cites Work
- Fuzzy sets as a basis for a theory of possibility
- The concept of a linguistic variable and its application to approximate reasoning. I
- Optimal Sequencing of a Single Machine Subject to Precedence Constraints
- A procedure for ordering fuzzy subsets of the unit interval
- The mean value of a fuzzy number
- The expected value of a fuzzy number
- Operations on fuzzy numbers
- Ranking fuzzy numbers with integral value.
- Title not available (Why is that?)
- Single value simulation of fuzzy variable
- One machine scheduling problem with fuzzy duedates
- Single machine, scheduling problem with fuzzy precedence relation
- Optimal fuzzy counterparts of scheduling rules
Cited In (21)
- SOME GENERAL PROPERTIES OF A FUZZY SINGLE MACHINE SCHEDULING PROBLEM
- Fuzzy scheduling of job orders in a two-stage flowshop with batch-processing machines
- Single machine scheduling with nonlinear lateness cost functions and fuzzy due dates
- Minimizing maximum cost for a single machine under uncertainty of processing times
- USING ANT COLONY OPTIMIZATION TO MINIMIZE THE FUZZY MAKESPAN AND TOTAL WEIGHTED FUZZY COMPLETION TIME IN FLOW SHOP SCHEDULING PROBLEMS
- Single machine fuzzy scheduling problem with release dates
- A class of polynomially solvable algorithm for due date assignment scheduling problem with asymmetric fuzzy processing time
- Fuzzy approach for production planning and detailed scheduling in paints manufacturing
- Title not available (Why is that?)
- The single machine ready time scheduling problem with fuzzy processing times
- Two scheduling problems with fuzzy due-dates
- One machine scheduling problem with fuzzy duedates
- Bi-objective cell loading problem with non-zero setup times with fuzzy aspiration levels in labour intensive manufacturing cells
- TWO-MACHINES SCHEDULING PROBLEM WITH FUZZY ALLOWABLE TIME CONSTRAINT
- USING GENETIC ALGORITHMS TO SOLVE FUZZY FLOW SHOP SCHEDULING PROBLEMS BASED ON POSSIBILITY AND NECESSITY MEASURES
- The EDD rule for fuzzy job time
- Survey on fuzzy shop scheduling
- Fuzzy bi-criteria scheduling on parallel machines involving weighted flow time and maximum tardiness
- Title not available (Why is that?)
- One machine scheduling problem with interval numbers
- Setting due dates to minimize the total weighted possibilistic mean value of the weighted earliness-tardiness costs on a single machine
This page was built for publication: On two single machine scheduling problems with fuzzy processing times and fuzzy due dates
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1869711)