Handling flexibility in a ``generalised job shop with a fuzzy approach
From MaRDI portal
Publication:1869716
DOI10.1016/S0377-2217(02)00563-5zbMath1037.90525MaRDI QIDQ1869716
Publication date: 28 April 2003
Published in: European Journal of Operational Research (Search for Journal in Brave)
Deterministic scheduling theory in operations research (90B35) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Related Items (2)
Fuzzy approach for production planning and detailed scheduling in paints manufacturing ⋮ Survey on fuzzy shop scheduling
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Job sequencing with fuzzy processing times
- Some efficient heuristic methods for the flow shop sequencing problem
- General local search methods
- On Graham's bound for cyclic scheduling
- Applying tabu search to the job-shop scheduling problem
- A Fast Taboo Search Algorithm for the Job Shop Problem
- An algorithm for hoist scheduling problems
- Fuzzy sets
This page was built for publication: Handling flexibility in a ``generalised job shop with a fuzzy approach