Handling flexibility in a ``generalised job shop with a fuzzy approach
From MaRDI portal
Publication:1869716
DOI10.1016/S0377-2217(02)00563-5zbMATH Open1037.90525MaRDI QIDQ1869716FDOQ1869716
Authors: Samir Allet
Publication date: 28 April 2003
Published in: European Journal of Operational Research (Search for Journal in Brave)
Recommendations
Deterministic scheduling theory in operations research (90B35) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Cites Work
- Fuzzy sets
- Title not available (Why is that?)
- Title not available (Why is that?)
- Title not available (Why is that?)
- Title not available (Why is that?)
- Applying tabu search to the job-shop scheduling problem
- A Fast Taboo Search Algorithm for the Job Shop Problem
- General local search methods
- Some efficient heuristic methods for the flow shop sequencing problem
- An algorithm for hoist scheduling problems
- Title not available (Why is that?)
- Job sequencing with fuzzy processing times
- Title not available (Why is that?)
- On Graham's bound for cyclic scheduling
Cited In (7)
- Title not available (Why is that?)
- Fuzzy approach for production planning and detailed scheduling in paints manufacturing
- Fuzzy Gilmore and Gomory algorithm: Application in robotic flow shops with the effects of job-dependent transportation and set-ups
- Survey on fuzzy shop scheduling
- A heuristic to schedule flexible job-shop in a glass factory
- Accessing feasible space in a generalized job shop scheduling problem with the fuzzy processing times: a fuzzy-neural approach
- Applying fuzzy logic and constraint networks to a problem of manufacturing flexibility
This page was built for publication: Handling flexibility in a ``generalised job shop with a fuzzy approach
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1869716)