A correlation and heuristic approach for obtaining production sequences requiring a minimum of tool replacements
From MaRDI portal
(Redirected from Publication:1869916)
Recommendations
- An objective function to address production sequencing with minimal tooling replacements
- Sequencing for minimal tooling replacements via a variety of objective functions
- scientific article; zbMATH DE number 1541306
- Optimal tool replacement and resetting strategies in automated manufacturing systems
- Optimal tool replacement for processes with low fraction defective
- Least in-sequence probability heuristic for mixed-volume production lines
- A heuristic for solving manufacturing process and equipment selection problems
- A matheuristic for parallel machine scheduling with tool replacements
Cites work
- A Note on the Generation of Random Normal Deviates
- A user's guide to tabu search
- Equation of state calculations by fast computing machines
- scientific article; zbMATH DE number 53182 (Why is no real title available?)
- scientific article; zbMATH DE number 1480194 (Why is no real title available?)
- scientific article; zbMATH DE number 194544 (Why is no real title available?)
- scientific article; zbMATH DE number 867338 (Why is no real title available?)
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- Optimization by simulated annealing
- Simulated annealing: A tool for operational research
- Tabu search and design optimization
Cited in
(5)- Sequencing mixed-model assembly lines: survey, classification and model critique
- The strong NP-hardness of the maximum lateness minimization scheduling problem with the processing-time based aging effect
- Sequencing for minimal tooling replacements via a variety of objective functions
- An objective function to address production sequencing with minimal tooling replacements
- Meta-heuristic algorithms for solving a fuzzy single-period problem
This page was built for publication: A correlation and heuristic approach for obtaining production sequences requiring a minimum of tool replacements
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1869916)