A correlation and heuristic approach for obtaining production sequences requiring a minimum of tool replacements
From MaRDI portal
Publication:1869916
DOI10.1016/S0305-0548(01)00110-1zbMath1029.90026MaRDI QIDQ1869916
Publication date: 28 April 2003
Published in: Computers \& Operations Research (Search for Journal in Brave)
Related Items (3)
The strong NP-hardness of the maximum lateness minimization scheduling problem with the processing-time based aging effect ⋮ Meta-heuristic algorithms for solving a fuzzy single-period problem ⋮ Sequencing mixed-model assembly lines: survey, classification and model critique
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Optimization by Simulated Annealing
- Simulated annealing: A tool for operational research
- Tabu search and design optimization
- A user's guide to tabu search
- A Note on the Generation of Random Normal Deviates
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- Equation of State Calculations by Fast Computing Machines
This page was built for publication: A correlation and heuristic approach for obtaining production sequences requiring a minimum of tool replacements