The simple \(F2//C \max\) with forbidden tasks in first or last position: a problem more complex that it seems
From MaRDI portal
Publication:1887767
DOI10.1016/j.ejor.2003.08.031zbMath1065.90035OpenAlexW2028781173MaRDI QIDQ1887767
Pierre Baptiste, Mohamed Moalla, Nour El Houda Saadani
Publication date: 22 November 2004
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2003.08.031
Related Items
Problem \(F2||C_{\max}\) with forbidden jobs in the first or last position is easy, Metaheuristics with restart and learning mechanisms for the no-idle flowshop scheduling problem with makespan criterion, Johnson's rule, composite jobs and the relocation problem
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Some efficient heuristic methods for the flow shop sequencing problem
- A new heuristic method for the flow shop sequencing problem
- An Evaluation of Flow Shop Sequencing Heuristics
- The Complexity of Flowshop and Jobshop Scheduling
- Flowshop/no-idle or no-wait scheduling to minimize the sum of completion times
- A Heuristic Algorithm for the n Job, m Machine Sequencing Problem
- NP-hardness of compact scheduling in simplified open and flow shops.