Lot streaming in the two-machine flow shop with setup times
From MaRDI portal
Publication:1897371
DOI10.1007/BF02099687zbMath0831.90070OpenAlexW2052864694MaRDI QIDQ1897371
Publication date: 27 August 1995
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/bf02099687
Related Items
A hybrid genetic algorithm for flowshop lot streaming with setups and variable sublots, Approximation methods for discrete lot streaming in flow shops, Single-job lot streaming in \(m - 1\) two-stage hybrid flowshops, Batch scheduling in the no-wait two-machine flowshop to minimize the makespan, Lot streaming in a multiple product permutation flow shop with intermingling, A simulated annealing with multiple-search paths and parallel computation for a comprehensive flowshop scheduling problem, Lot streaming with detached setups in three-machine flow shops, An integrated tabu search algorithm for the lot streaming problem in job shops, Lot streaming for quality control in two-stage batch production, Lot streaming in open shops
Cites Work
- Flow shop scheduling with lot streaming
- Sequencing n Jobs on Two Machines with Arbitrary Time Lags
- Discussion: Sequencing n Jobs on Two Machines with Arbitrary Time Lags
- Optimal two- and three-stage production schedules with setup times included
- A concise survey of efficiently solvable special cases of the permutation flow-shop problem
- Two- and three-machine flow shop scheduling problems with equal sized transfer batches
- A General Bounding Scheme for the Permutation Flow-Shop Problem
- Basic Techniques for Lot Streaming
- A Heuristic Algorithm for the n Job, m Machine Sequencing Problem