Minimizing the error bound for the dynamic lot size model
From MaRDI portal
Publication:1904609
DOI10.1016/0167-6377(94)00063-CzbMath0836.90066OpenAlexW2007096707MaRDI QIDQ1904609
Hsin-Der Chen, Chung-Yee Lee, Donald W. Hearn
Publication date: 7 January 1996
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0167-6377(94)00063-c
Related Items (2)
Rounding heuristics for multiple product dynamic lot-sizing in the presence of queueing behavior ⋮ Lot sizing and scheduling -- survey and extensions
Cites Work
- Unnamed Item
- A dynamic programming algorithm for dynamic lot size models with piecewise linear costs
- Extreme points of Leontief substitution systems
- Error bound for the dynamic lot size model with backlogging
- Dynamic Version of the Economic Lot Size Model
- Conditions for the Existence of Planning Horizons
- Minimal forecast horizon procedures for dynamic lot size models
- Rolling Planning Horizons: Error Bounds for the Dynamic Lot Size Model
- Forecast horizons for the discounted dynamic lot-size problem allowing speculative motive
- Deterministic Production Planning: Algorithms and Complexity
- A Simple Forward Algorithm to Solve General Dynamic Lot Sizing Models with n Periods in 0(n log n) or 0(n) Time
- Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case
- Forecast Horizons in the Discounted Dynamic Lot Size Model
- Planning Horizons for the Dynamic Lot Size Model with Backlogging
- Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results
- Bounded Production and Inventory Models with Piecewise Concave Costs
- A Deterministic Multi-Period Production Planning Model with Piecewise Concave Production and Holding-Backorder Costs
- Improved Algorithms for Economic Lot Size Problems
- Minimal Forecast Horizons and a New Planning Procedure for the General Dynamic Lot Sizing Model: Nervousness Revisited
- Existence of Forecast Horizons in Undiscounted Discrete-Time Lot Size Models
- A Deterministic Multi-Period Production Scheduling Model with Backlogging
- Contraction Mappings in the Theory Underlying Dynamic Programming
- Extensions of the Planning Horizon Theorem in the Dynamic Lot Size Model
This page was built for publication: Minimizing the error bound for the dynamic lot size model