A multilevel machine and vehicle scheduling in a flexible manufacturing system
From MaRDI portal
(Redirected from Publication:1921087)
Recommendations
Cites work
- scientific article; zbMATH DE number 63644 (Why is no real title available?)
- scientific article; zbMATH DE number 744104 (Why is no real title available?)
- Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems
- Modelling and scheduling of a flexible manufacturing system
- Vehicle scheduling in two-cycle flexible manufacturing systems
Cited in
(14)- Decision making algorithm for a class of two-level manufacturing systems
- Simultaneous job input sequencing and vehicle dispatching in a single-vehicle automated guided vehicle system: a heuristic branch-and-bound approach coupled with a discrete events simulation model
- Simultaneous loading, routing, and assembly plan selection in a flexible assembly system
- A fuzzy goal-programming model of machine-tool selection and operation allocation problem in FMS: a quick converging simulated annealing-based approach
- Multilevel intelligent scheduling and control system for an automated flow shop manufacturing environment
- scientific article; zbMATH DE number 744104 (Why is no real title available?)
- A Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMS
- A simple metaheuristic approach to the simultaneous scheduling of machines and automated guided vehicles
- Vehicle scheduling in two-cycle flexible manufacturing systems
- A simulation factory control model under a chance constraint
- Scheduling of machines and automated guided vehicles in FMS using differential evolution
- A Multi-Fidelity Model Approach for Simultaneous Scheduling of Machines and Vehicles in Flexible Manufacturing Systems
- Machine-tool selection and operation allocation in FMS: Solving a fuzzy goal-programming model using a genetic algorithm
- Joint production and transportation scheduling in flexible manufacturing systems
This page was built for publication: A multilevel machine and vehicle scheduling in a flexible manufacturing system
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1921087)