The effect of serial correlation on the in-control average run length of cumulative score charts
DOI10.1016/0378-3758(95)00153-0zbMATH Open0854.62093OpenAlexW2025595446MaRDI QIDQ1923402FDOQ1923402
Authors: Walter Böhm, Peter Hackl
Publication date: 19 January 1997
Published in: Journal of Statistical Planning and Inference (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0378-3758(95)00153-0
Recommendations
- EVVMA and cusum control charts in the presence of correlation
- Performance of CUSUM Control Schemes for Serially Correlated Observations
- Applications: CUSUM Charts for AR1 Data: are they worth the Effort?
- Average run length of cumulative sum control charts for \(\mathrm{SARMA}(1, 1)_{\mathrm{L}}\) models
Markov chainserial correlationCUSUMparametrizationsscoresrun length distributionprocess controlcorrelated random walkShewhart chartfirst-order autoregressive processMonte Carlo estimatesin-control average run lengthasymptotic average run lengthcumulative score chart
Applications of Markov chains and discrete-time Markov processes on general state spaces (social mobility, learning theory, industrial processes, etc.) (60J20) Applications of statistics in engineering and industry; control charts (62P30) Sequential statistical analysis (62L10)
Cites Work
- Title not available (Why is that?)
- A test for a change in a parameter occurring at an unknown point
- The Effect of Serial Correlation on the Performance of CUSUM Tests
- Title not available (Why is that?)
- Finite Continuous Time Markov Chains
- Title not available (Why is that?)
- Tables for Computing Bivariate Normal Probabilities
- A Combined Shewhart-Cumulative Score Quality Control Chart
- Note on a Distribution-Free CUSUM Technique
- A Control Chart Based on Cumulative Scores
- Variable Sampling Interval Combined Shewart-Cumulative Score Quality Control Procedure
- A Cumulative Score Control Scheme
Cited In (9)
- Single and dual reference-free CUSCORE charts for detecting unknown patterned mean shifts
- The effect of Phase I sample size on the run length performance of control charts for autocorrelated data
- A Cumulative Score Control Scheme
- On the run length of a Shewhart chart for correlated data
- On the average run lengths of quality control schemes using a Markov chain approach
- Inference for post-change parameters after sequential CUSUM test under AR(1) model
- On average run lengths of control charts for autocorrelated processes
- Performance of CUSUM Control Schemes for Serially Correlated Observations
- Title not available (Why is that?)
This page was built for publication: The effect of serial correlation on the in-control average run length of cumulative score charts
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1923402)