Mathematical Research Data Initiative
Main page
Recent changes
Random page
SPARQL
MaRDI@GitHub
New item
Special pages
In other projects
MaRDI portal item
Discussion
View source
View history
English
Log in

Optimising a cascade of hydro-electric power stations

From MaRDI portal
Publication:1979736
Jump to:navigation, search

DOI10.1007/978-3-030-50388-8_11zbMATH Open1471.93202OpenAlexW3113000899MaRDI QIDQ1979736FDOQ1979736


Authors: Marta M. B. Pascoal Edit this on Wikidata


Publication date: 3 September 2021


Full work available at URL: https://doi.org/10.1007/978-3-030-50388-8_11




Recommendations

  • scientific article; zbMATH DE number 1223653
  • On construction sequence optimization of cascaded hydroelectric stations
  • Optimal hydropower generation scheduling for a cascade
  • Optimizing profits from hydroelectricity production
  • Discharge allocation for hydro-electric generating stations


zbMATH Keywords

optimizationhydroelectric power plantbranched cascade


Mathematics Subject Classification ID

Applications of optimal control and differential games (49N90) Application models in control theory (93C95)



Cited In (5)

  • On construction sequence optimization of cascaded hydroelectric stations
  • Investigation of waterhammer problems in wind-hydro hybrid power plants
  • Hydropower with Financial Information*
  • Optimizing profits from hydroelectricity production
  • Title not available (Why is that?)





This page was built for publication: Optimising a cascade of hydro-electric power stations

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1979736)

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1979736&oldid=14440718"
Tools
What links here
Related changes
Printable version
Permanent link
Page information
This page was last edited on 1 February 2024, at 16:53. Warning: Page may not contain recent updates.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki