Analysis of a MAP/PH(1), PH(2)/2 production inventory system under the Bernoulli vacation scheme
From MaRDI portal
Publication:1980552
DOI10.1007/978-3-030-72247-0_29zbMATH Open1473.90005OpenAlexW3151432457MaRDI QIDQ1980552FDOQ1980552
Authors: Pathari Beena, K. P. Jose
Publication date: 8 September 2021
Full work available at URL: https://doi.org/10.1007/978-3-030-72247-0_29
Recommendations
- Analysis of MAP/PH(1), PH(2)/2 queue with Bernoulli vacations
- An exact analysis of a joint production-inventory problem in two-echelon inventory systems
- Analysis of MAP/PH(1), PH(2)/2 queue with Bernoulli schedule vacation, Bernoulli feedback and renege of customers
- \(MAP/PH(1)\), \(PH(2)/2\) finite retrial inventory system with service facility, multiple vacations for servers
- Exact analysis of the $(R, Q)$ inventory policy in a two-echelon production-inventory system
- Analysis of production/inventory systems with several production rates
- Analysis of a production inventory system with two modes of service using matrix analytic method
- scientific article; zbMATH DE number 4112355
- On a retrial production inventory system with vacation and multiple servers
- Analysis of a Two‐Phase Queueing System with Vacations and Bernoulli Feedback
Applications of queueing theory (congestion, allocation, storage, traffic, etc.) (60K30) Inventory, storage, reservoirs (90B05)
Cites Work
- Queueing systems with vacations - a survey
- Numerical investigation of a multiserver retrial model
- Control of the service process in a queueing system
- Oscillating random walk models for GI/G/1 vacation systems with Bernoulli schedules
- Production inventory with service time and vacation to the server
- Analysis of an \(M\)/\(M\)/\(N\) queue with Bernoulli service schedule
- \(MAP/PH(1)\), \(PH(2)/2\) finite retrial inventory system with service facility, multiple vacations for servers
- On a retrial production inventory system with vacation and multiple servers
- Analysis of MAP/PH(1), PH(2)/2 queue with Bernoulli vacations
- Analysis of queue-length dependent vacations and P-limited service in \(\mathrm{BMAP}/\mathrm{G}/1/N\) systems: stationary distributions and optimal control
- Analysis of MAP/PH(1), PH(2)/2 queue with Bernoulli schedule vacation, Bernoulli feedback and renege of customers
- MAP/PH/1 queueing model with working vacation and crowdsourcing
This page was built for publication: Analysis of a MAP/PH(1), PH(2)/2 production inventory system under the Bernoulli vacation scheme
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1980552)