A two-stage solution approach for plastic injection machines scheduling problem
From MaRDI portal
Publication:1983688
DOI10.3934/jimo.2020022zbMath1476.90302OpenAlexW3007489710MaRDI QIDQ1983688
Aydin Sipahioglu, Tugba Saraç, Emine Akyol Ozer
Publication date: 10 September 2021
Published in: Journal of Industrial and Management Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3934/jimo.2020022
integer programmingmulti-objective programmingidentical parallel machine schedulingplastic injection
Applications of mathematical programming (90C90) Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Minimization of maximum lateness on parallel machines with sequence-dependent setup times and job release dates
- Parallel machine scheduling with precedence constraints and setup times
- Rescheduling of identical parallel machines under machine eligibility constraints.
- A mathematical model and heuristic algorithms for an unrelated parallel machine scheduling problem with sequence-dependent setup times, machine eligibility restrictions and a common server
- An ant colony optimization algorithm for load balancing in parallel machines with sequence-dependent setup times
- Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs
- MIP models and a matheuristic algorithm for an identical parallel machine scheduling problem under multiple copies of shared resources constraints
This page was built for publication: A two-stage solution approach for plastic injection machines scheduling problem