Line planning and passenger routing problem with application to the Quito transportation system
From MaRDI portal
Publication:2073473
DOI10.1504/IJMOR.2021.116960zbMATH Open1482.90042OpenAlexW4242800588MaRDI QIDQ2073473FDOQ2073473
Authors: Ramiro Torres
Publication date: 2 February 2022
Published in: International Journal of Mathematics in Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1504/ijmor.2021.116960
Recommendations
- Line planning on paths and tree networks with applications to the Quito trolebús system
- Line planning on tree networks with applications to the Quito Trolebús system
- Models for line planning in public transport
- Line planning in public transportation: models and methods
- scientific article; zbMATH DE number 5117501
Applications of mathematical programming (90C90) Transportation, logistics and supply chain management (90B06)
Cited In (10)
- Integrated line planning and passenger routing: connectivity and transfers
- The edge investment problem: upgrading transit line segments with multiple investing parties
- On the line planning problems of the hub public-transportation networks
- Line planning on tree networks with applications to the Quito Trolebús system
- The line planning routing game
- Simultaneous network line planning and traffic assignment
- Line planning on paths and tree networks with applications to the Quito trolebús system
- Delay resistant line planning with a view towards passenger transfers
- The complexity of integrating passenger routing decisions in public transportation models
- A direct connection approach to integrated line planning and passenger routing
This page was built for publication: Line planning and passenger routing problem with application to the Quito transportation system
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2073473)