New exact and heuristic algorithms to solve the prize-collecting job sequencing problem with one common and multiple secondary resources
From MaRDI portal
Publication:2106718
Recommendations
- \(\mathrm{A}^\ast\) search for prize-collecting job sequencing with one common and multiple secondary resources
- Job sequencing with one common and multiple secondary resources: an A*/beam search based anytime algorithm
- A hybrid metaheuristic for the prize-collecting single machine scheduling problem with sequence-dependent setup times
- Exact and heuristic algorithms for order acceptance and scheduling with sequence-dependent setup times
- Optimal interval scheduling with a resource constraint
Cites work
- Automation and Combination of Linear-Programming Based Stabilization Techniques in Column Generation
- Decision Diagrams for Discrete Optimization: A Survey of Recent Advances
- Improved branch-cut-and-price for capacitated vehicle routing
- Iterated local search for the team orienteering problem with time windows
- New enhancements for the exact solution of the vehicle routing problem with time windows
- Note on the Complexity of the Shortest Path Models for Column Generation in VRPTW
- Orienteering problem: a survey of recent variants, solution approaches and applications
- Particle therapy patient scheduling with limited starting time variations of daily treatments
- Path-reduced costs for eliminating arcs in routing and scheduling
- Sequencing jobs that require common resources on a single machine: A solvable case of the TSP
- Single-machine scheduling problems with past-sequence-dependent setup times
- Solving bin packing problems using VRPSolver models
- The orienteering problem: a survey
- The third comprehensive survey on scheduling problems with setup times/costs
- \(\mathrm{A}^*\)-based construction of decision diagrams for a prize-collecting scheduling problem
- \(\mathrm{A}^\ast\) search for prize-collecting job sequencing with one common and multiple secondary resources
This page was built for publication: New exact and heuristic algorithms to solve the prize-collecting job sequencing problem with one common and multiple secondary resources
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2106718)