An adaptive robust optimization model for parallel machine scheduling
From MaRDI portal
Publication:2106719
DOI10.1016/j.ejor.2022.07.018OpenAlexW4285637700MaRDI QIDQ2106719
Izack Cohen, Krzysztof Postek, Shimrit Shtern
Publication date: 19 December 2022
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://arxiv.org/abs/2102.08677
Related Items (1)
Cites Work
- The impact of the existence of multiple adjustable robust solutions
- Robust multi-market newsvendor models with interval demand data
- Min-max and min-max regret versions of combinatorial optimization problems: A survey
- Adjustable robust solutions of uncertain linear programs
- A survey of adjustable robust optimization
- Two branch-and-bound algorithms for the robust parallel machine scheduling problem
- The decision rule approach to optimization under uncertainty: methodology and applications
- The proactive and reactive resource-constrained project scheduling problem
- Robust scheduling with budgeted uncertainty
- Optimal stochastic scheduling
- A MIP formulation for the minmax regret total completion time in scheduling with unrelated parallel machines
- Solving two-stage robust optimization problems using a column-and-constraint generation method
- Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effects
- Predictive-reactive strategy for identical parallel machine rescheduling
- Multistage Robust Mixed-Integer Optimization with Adaptive Partitions
- Multistage Adjustable Robust Mixed-Integer Optimization via Iterative Splitting of the Uncertainty Set
- Approximation in stochastic scheduling
- Optimality of Affine Policies in Multistage Robust Optimization
- The stochastic time–cost tradeoff problem: A robust optimization approach
- K-Adaptability in Two-Stage Robust Binary Programming
- The Price of Robustness
- Scheduling jobs by stochastic processing requirements on parallel machines to minimize makespan or flowtime
- Robust Scheduling to Hedge Against Processing Time Uncertainty in Single-Stage Production
- Approximation results for makespan minimization with budgeted uncertainty
- Unnamed Item
- Unnamed Item
- Unnamed Item
This page was built for publication: An adaptive robust optimization model for parallel machine scheduling