Scheduling with generalized and periodic due dates under single- and two-machine environments
From MaRDI portal
Publication:2115317
Recommendations
- Two-machine ordered flow shop scheduling with generalized due dates
- scientific article; zbMATH DE number 4172724
- A single machine scheduling with generalized and periodic due dates to minimize total deviation
- On the complexity of generalized due date scheduling problems
- Just-in-time scheduling with generalized due dates and identical due date intervals
Cites work
- scientific article; zbMATH DE number 4172724 (Why is no real title available?)
- scientific article; zbMATH DE number 167292 (Why is no real title available?)
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- A Functional Equation and its Application to Resource Allocation and Sequencing Problems
- Earliness-Tardiness Scheduling Problems, I: Weighted Deviation of Completion Times About a Common Due Date
- Earliness–Tardiness Scheduling Problems, II: Deviation of Completion Times About a Restrictive Common Due Date
- Just-in-time scheduling with generalized due dates and identical due date intervals
- On the complexity of generalized due date scheduling problems
- Optimal two- and three-stage production schedules with set-up time included
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Scheduling shops to minimize the weighted number of late jobs
- Scheduling with Fixed Delivery Dates
- Single-machine scheduling to minimize the total earliness and tardiness is strongly NP-hard
- Strong NP-hardness of minimizing total deviation with generalized and periodic due dates
- The Complexity of Flowshop and Jobshop Scheduling
- Two-machine ordered flow shop scheduling with generalized due dates
- Unary NP-hardness of minimizing the total deviation with generalized or assignable due dates
- Unary NP-hardness of minimizing total weighted tardiness with generalized due dates
Cited in
(11)- Just-in-time scheduling with generalized due dates and identical due date intervals
- scientific article; zbMATH DE number 4172724 (Why is no real title available?)
- Scheduling a single machine with multiple due dates per job
- A note on the SPT heuristic for solving scheduling problems with generalized due dates
- Min–max version of single-machine scheduling with generalized due dates under scenario-based uncertainty
- Scheduling with sub-jobs' due dates
- Two-machine ordered flow shop scheduling with generalized due dates
- Two due date assignment problems in scheduling a single machine
- A single machine scheduling with generalized and periodic due dates to minimize total deviation
- scientific article; zbMATH DE number 3914067 (Why is no real title available?)
- On the complexity of generalized due date scheduling problems
This page was built for publication: Scheduling with generalized and periodic due dates under single- and two-machine environments
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2115317)