Preventive replacement policies for parallel systems with deviation costs between replacement and failure
DOI10.1007/s10479-020-03791-6zbMath1492.90052OpenAlexW3087634258MaRDI QIDQ2150829
Satoshi Mizutani, Xufeng Zhao, Toshio Nakagawa, Ming-Chih Chen
Publication date: 30 June 2022
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-020-03791-6
Applications of statistics in engineering and industry; control charts (62P30) Reliability, availability, maintenance, inspection in operations research (90B25) Applications of renewal theory (reliability, demand theory, etc.) (60K10) Reliability and life testing (62N05)
Related Items (3)
Cites Work
- Unnamed Item
- Unnamed Item
- Recent advances in multi-state systems reliability. Theory and applications
- Aircraft scheduled airframe maintenance and downtime integrated cost model
- Optimization problems of replacement first or last in reliability theory
- Extended age maintenance models and its optimization for series and parallel systems
- Replacement policies with general models
- Random number of units for \(K\)-out-of-\(n\) systems
- Reliability modelling of a parallel system with a supporting device and two types of preventive maintenance
- Distribution of order statistics with random sample size
- A model of preventive maintenance for parallel, series, and single-item replacement systems based on statistical analysis
- Scheduling
This page was built for publication: Preventive replacement policies for parallel systems with deviation costs between replacement and failure