Multimode time-cost-robustness trade-off project scheduling problem under uncertainty
From MaRDI portal
Publication:2156293
DOI10.1007/s10878-020-00636-7zbMath1495.90182OpenAlexW3048693462MaRDI QIDQ2156293
Nengmin Wang, Mario Vanhoucke, Xue Li, Zhengwen He
Publication date: 18 July 2022
Published in: Journal of Combinatorial Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10878-020-00636-7
genetic algorithmtrade-offepsilon-constraint methodmultiobjective optimization modelproject scheduling problem
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Complexity results for the linear time-cost tradeoff problem with multiple milestones and completely ordered jobs
- Best routes selection in multimodal networks using multi-objective genetic algorithm
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- New concepts for activity float in resource-constrained project management
- The discrete time/cost trade-off problem: Extensions and heuristic procedures
- Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach
- Robust scheduling and robustness measures for the discrete time/cost trade-off problem
- Effective implementation of the \(\varepsilon \)-constraint method in multi-objective mathematical programming problems
- Discrete time/cost trade-off problem: a decomposition-based solution algorithm for the budget version
- Recoverable robust timetabling for single delay: Complexity and polynomial algorithms for special cases
- Scheduling subject to resource constraints: Classification and complexity
- The discrete time-cost tradeoff problem revisited
- Optimal procedures for the discrete time/cost trade-off problem in project networks
- PSPLIB -- a project scheduling problem library
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
- A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem
- A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem
- Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap
- Real-time scheduling optimization considering the unexpected events in home health care
- Project scheduling under uncertainty: survey and research potentials
- Network decomposition-based benchmark results for the discrete time-cost tradeoff problem
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances
- Multi-objective metaheuristic algorithms for the resource-constrained project scheduling problem with precedence relations
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem
- Lawler's minmax cost problem under uncertainty
- A linear time-cost tradeoff problem with multiple milestones under a comb graph
- A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
- Multi-mode resource constrained multi-project scheduling and resource portfolio problem
- Approximation Algorithms for the Discrete Time-Cost Tradeoff Problem
- Two Approaches to Problems of Resource Allocation among Project Activities -- A Comparative Study
- Note—A Note on “A Simple CPM Time-Cost Tradeoff Algorithm”
- Pareto simulated annealing—a metaheuristic technique for multiple‐objective combinatorial optimization
- Critical Path Problems with Concave Cost-Time Curves
- Project scheduling with multiple modes: A genetic algorithm