Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space
From MaRDI portal
Publication:2197157
Recommendations
- The workload balancing problem at air cargo terminals
- The air cargo load planning problem -- a consolidated problem definition and literature review on related problems
- The air-cargo consolidation problem with pivot weight: models and solution methods
- Air cargo scheduling: integrated models and solution procedures
- Labour scheduling at an airport refuelling installation
Cites work
- scientific article; zbMATH DE number 3550182 (Why is no real title available?)
- A $\frac32$‐Approximation Algorithm for Scheduling Independent Monotonic Malleable Tasks
- A branch-price-and-cut algorithm for multi-mode resource leveling
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
- A survey of berth allocation and quay crane scheduling problems in container terminals
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Balancing mixed-model assembly lines: a computational evaluation of objectives to smoothen workload
- Complexity results for scheduling tasks with discrete starting times
- Exact methods for the resource levelling problem
- Freight handling personnel scheduling at air cargo terminals
- Integrated truck and workforce scheduling to accelerate the unloading of trucks
- Mixed-integer linear programming for resource leveling problems
- Optimal berth allocation and time-invariant quay crane assignment in container terminals
- Optimal resource leveling using non-serial dynamic programming
- Personnel scheduling: a literature review
- Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- Resource leveling in make-to-order production: modeling and heuristic solution method
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Scheduling malleable tasks on parallel processors to minimize the makespan
- Scheduling tests in automotive R\&D projects
- Stochastic models for air cargo terminal manpower supply planning in long-term operations
- The air cargo load planning problem -- a consolidated problem definition and literature review on related problems
- The capacitated \(p\)-hub median problem with integral constraints: an application to a Chinese air cargo network
- The total adjustment cost problem: applications, models, and solution algorithms
- The train driver recovery problem-a set partitioning based model and solution method
- Vehicle routing problems with loading constraints: state-of-the-art and future directions
Cited in
(3)
This page was built for publication: Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2197157)