Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space

From MaRDI portal
Publication:2197157

DOI10.1007/s00291-020-00580-2zbMath1446.90077OpenAlexW3007774872MaRDI QIDQ2197157

Christoph H. Glock, Hamid Abedinnia, Anne Lange, Simon Emde

Publication date: 28 August 2020

Published in: OR Spectrum (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s00291-020-00580-2






Cites Work


This page was built for publication: Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space