Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space

From MaRDI portal
Publication:2197157

DOI10.1007/S00291-020-00580-2zbMATH Open1446.90077OpenAlexW3007774872MaRDI QIDQ2197157FDOQ2197157


Authors: Simon Emde, Hamid Abedinnia, Anne Lange, Christoph H. Glock Edit this on Wikidata


Publication date: 28 August 2020

Published in: OR Spectrum (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s00291-020-00580-2




Recommendations




Cites Work


Cited In (3)





This page was built for publication: Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2197157)