Multi server machine repair problem with unreliable server and two types of spares under asynchronous vacation policy
DOI10.1504/IJMOR.2017.083187zbMath1452.90149OpenAlexW4231849154MaRDI QIDQ2204287
Publication date: 15 October 2020
Published in: International Journal of Mathematics in Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1504/ijmor.2017.083187
performance measuresmatrix geometric methodrandom breakdownsserver breakdownqueue sizeunreliable serverssparesasynchronous vacation policymulti server machine repair
Queues and service in operations research (90B22) Reliability, availability, maintenance, inspection in operations research (90B25)
Related Items (3)
This page was built for publication: Multi server machine repair problem with unreliable server and two types of spares under asynchronous vacation policy