A note on the single machine CON and CONW problems with lot scheduling
From MaRDI portal
Publication:2230735
Recommendations
- Scheduling with a common due-window: polynomially solvable cases
- Single-machine scheduling CON/SLK due window assignment problems with sum-of-processed times based learning effect
- CON due-date determination and sequencing
- Minmax scheduling problems with a common due-window
- Lot scheduling on a single machine to minimize the (weighted) number of tardy orders
Cites work
- A survey of the state-of-the-art of common due date assignment and scheduling research
- A survey on scheduling problems with due windows
- A two-agent single machine scheduling problem with due-window assignment and a common flow-allowance
- Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem
- Common due window size and location determination in a single machine scheduling problem
- Determination of common due window location in a single machine scheduling problem
- Lot scheduling on a single machine
- Lot scheduling on a single machine to minimize the (weighted) number of tardy orders
- Minmax scheduling problems with common due-date and completion time penalty
- Research on common due window assignment flowshop scheduling with learning effect and resource allocation
- Single machine lot scheduling to minimize the total weighted (discounted) completion time
- Single machine lot scheduling with optional job-rejection
- Single-machine common due date total earliness/tardiness scheduling with machine unavailability
- Single-machine lot scheduling with variable lot processing times
- Two-stage medical supply chain scheduling with an assignable common due window and shelf life
Cited in
(4)- A note on lot scheduling on a single machine to minimize maximum weighted tardiness
- A single-machine, single-wafer-processing, multiple-lots-per-carrier scheduling problem to minimize the sum of lot completion times
- Approaches to Solving Scheduling with Due-Window Assignment and Deterioration Effects
- Polynomial time algorithms to find Pareto optimal schedules of bicriteria lot scheduling problems with splitable jobs on a single parallel-batch machine
This page was built for publication: A note on the single machine CON and CONW problems with lot scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2230735)