The bilevel optimisation of a multi-agent project scheduling and staffing problem
From MaRDI portal
Publication:2239938
DOI10.1016/j.ejor.2021.03.028zbMath1487.90307OpenAlexW3137736009MaRDI QIDQ2239938
P. Milička, Broos Maenhout, Mario Vanhoucke, Přemysl Šucha
Publication date: 5 November 2021
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2021.03.028
Related Items
Cites Work
- Unnamed Item
- Unnamed Item
- An exact algorithm for an integrated project staffing problem with a homogeneous workforce
- On bilevel machine scheduling problems
- An exact algorithm for minimizing resource availability costs in project scheduling
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Scheduling subject to resource constraints: Classification and complexity
- Ensuring quality in resource constrained project scheduling
- Project scheduling. A research handbook.
- Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
- Foundations of bilevel programming
- Bilevel programming and applications
- Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Mixed-integer linear programming for resource leveling problems
- Exact solution approaches for bilevel lot-sizing
- Scheduling and staffing multiple projects with a multi-skilled workforce
- An overview of bilevel optimization
- Exponential distribution-based genetic algorithm for solving mixed-integer bilevel programming problems
- On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- The Mixed Integer Linear Bilevel Programming Problem
- Interior Methods for Mathematical Programs with Complementarity Constraints
- Minimizing Resource Availability Costs in Time-Limited Project Networks
- The resource renting problem subject to temporal constraints
This page was built for publication: The bilevel optimisation of a multi-agent project scheduling and staffing problem